400-860-6560
support hotline 400-860-6560
Technical Support

Instructional Videos

Frequently Asked Questions

1
MES - Frequently Asked Questions

1)How is the workflow configured?

Enter the workflow module, support the configuration of single node, multi-node, and recurring nodes, select as required, you also need to set the reviewer, just pay attention to the upper and lower nodes associated.

2)How is the printer information configured?

Create the printer configuration and upload the print template. It should be noted that the printing parameters need to be consistent with the parameters in the template, otherwise the printed barcode will be empty.

3)Lifecycle of work orders?

Create work order, release work order, start production of work order, complete production of work order, close work order, and scrap product.

4)What are the relationships between exception codes, exception code groups, handling codes, and handling code groups?

The exception code group can contain exception codes for selecting exception information when entering the maintenance station, and the processing code group can contain processing codes for selection by maintenance personnel when the product is being repaired.

5)How do I consume materials when crossing the station?

The system supports automatic consumption, consumption by quantity and consumption by product number. Products consumed by quantity can be consumed by directly entering the consumption quantity, while materials consumed by material code need to scan the material number.

6)What are the connections between process routes, processes, process steps, work stations, and work centers?

Process routes, process steps and processes are all at the logical level, with processes forming process steps and process steps forming process routes, while work centers and jobs are at the physical level, with one process step corresponding to multiple work centers and one work center corresponding to multiple workstations.


2
Why smart manufacturing?

Intelligent manufacturing transformation, digital transformation is a development opportunity for industrial enterprises, in the form of enterprise production is simply understood, from the traditional mass production, to the trend of personalized customization, so that the entire production process more flexible, personalized, customized. After the realization of the industrial enterprise will become the enterprise of data, innovation, integration, and continuous rapid change.

Because the enterprise has become "smart", so in the product design concept, marketing concept, consumer experience concept, and service concept, will produce a series of profound changes, so that enterprises in the industry chain competition to gain a competitive advantage, to win the market competition.

In the consumer concept has changed the relationship between customers and enterprises, from a sales relationship "I need this product" to "this product is customized for me"; the design concept from "batch copy " to "flexible customized products", closer to customer needs, but also to create profit margins; marketing concept from the "market customer portrait" to "accurate single individual The marketing concept has changed from "market-oriented customer portrait" to "precise single-individual" operation, because of the support of big data. Service concept, also because of the "intelligent" transformation, become passive to active.

From the above description, we can simply analogize, after the completion of the transformation of industrial enterprises, like modern combat troops, as well as the completion of technology-intensive weaponry, the units collaborate with each other, reconnaissance, communications, command, weapons, supply supporting orderly synergy, the result is: unprecedented expansion of combat space, combat operations without the constraints of weather time, combat command high and low flexible automation. The competition between industrial enterprises, and the competition between the armed forces, the essence is the same, after the completion of the transformation of industrial enterprises and the old traditional industrial enterprises, competition is not at all on a level.

#Smart Manufacturing#The road of transformation is a systematic project, the impact on the enterprise is also all-round, of course, leading to the transformation of the difficulty is also quite high. Replace the accumulation of equipment, digital pilot, and finally reduced to nothing more than a pile of digital technology, can not bring the real intelligence, as if a certain armed forces assembled a few more intelligent drones, modern single portable missiles only. He must complete the fundamental transformation of the three dimensions of decision-making mode, response speed and customer experience.

The process of transformation is actually the practical process of informationization, automation and intelligence, and the three in one, and the enterprise is on the ground. The three need a comprehensive balance, one cannot be missing, but any one of the three elements is missing, will lead to transformation failure. For a large number of midstream enterprises in the industry chain, time and money are not allowed, more careful thinking, less detours, less mistakes is a victory. What are the common pits in the process of transformation?

3
Smart Manufacturing Transformation Recommendations

We have recognized the common misunderstandings in the process of digital transformation. The road of transformation and renovation is actually the road of building business models and the road of shaping the competitiveness of enterprises. The transformation process can follow the following three principles: the principle of going hand in hand, the principle of gradual progress, and the principle of continuous adherence; do not blindly follow the wind and three minutes of enthusiasm. The process of transformation has not yet succeeded, and enterprises still need to work hard.

4
WMS - Frequently Asked Questions

1). How to define the naming rules and naming lengths when creating library bits

The creation of a storage space (storage unit) is based on the naming length and cell level defined in the rules of the storage space template. The naming length in the template refers to the length of the storage space name entered when creating the storage space, and the cell level refers to the number of levels of the storage space.

2)What is the difference between inventory transfer and inter-warehouse transfer?

Inventory transfer refers to the same warehouse or different warehouses between the transfer of goods, do not need to go out of the warehouse inbound process, while the transfer between warehouses refers to the transfer of multiple materials between different warehouses, need to follow the outbound - packaging - shipping - receiving process.

3)Can I put it on the shelf directly after I receive it?

After receiving the goods can not be directly on the shelves, need to pass IQA inspection, inspection of qualified materials can only be shelved into the warehouse, unqualified rejected materials can not be stored.

4)What is the difference between inventory material inquiry and stock material inquiry?

Inventory material summary is to query the total number of all materials stored in the warehouse, and the location material query is to query the materials according to each location and view the number of materials stored in each location.

5)How do I track my shipments after they leave the warehouse?

After the execution of picking out, the goods need to be packed and shipped. Enter the packing station in the operation center interface to pack the goods, and enter the shipping station to ship the goods after completion.

6)Are the packing and shipping stations in the operation center configurable?

The sites in the operation center are configurable, and users can configure the sites in the management item - Workstation and configure the plug-ins used for the sites in the plug-in management according to their warehouse needs.


5
EMS - Frequently Asked Questions

1)What types of equipment are there?

Equipment is divided into two categories: equipment and non-equipment, and non-equipment contains types of spare parts and consumables.

2)Why can't I select equipment data on the departmental loan, equipment maintenance, and equipment obsolescence pages when the equipment is already in inventory?

The Department Loan, Equipment Repair, and Equipment Obsolescence pages only show equipment that has been claimed.

3)Why can't I select the received spare parts on the departmental loan, equipment maintenance, and equipment obsolescence pages?

Spare parts do not have equipment numbers.

4)Is all incoming equipment a fixed asset?

Not all incoming equipment belongs to fixed assets, incoming equipment belongs to enterprise assets, but the incoming equipment will be judged whether the unit price of the equipment reaches the amount of incoming fixed assets, and reaches belongs to fixed assets.

5)Where is the amount of incoming funds maintained?

On the [Asset Type] page, different types of equipment can be maintained with the amount of fixed assets.

6)What is the difference between adding an inspection schedule, material type and equipment number?

When adding inspection plan, choose one of material type and equipment number, material type refers to a type of multiple equipment to be inspected, and equipment number refers to a specific equipment inspection.

7)Make an inspection plan, but there is no point inspection function on the web side, so where is the point inspection equipment and submit the point inspection results?

Mobile APP can point to check the equipment, in APP can point to check the equipment according to the inspection route, also can directly scan the code equipment number point to check the equipment, return the point to check the results to the web terminal.

8)What other functions does the mobile app have besides the ability to spot check equipment?

Inventory equipment, submit fault and defect repair, inspection task inquiry, report analysis, and information reminder.

9)How to generate device number, device QR code and barcode by scanning device number?

Generate QR codes and bar codes for devices online using the system's QR code function.

10)What are the effects of write-offs of end-of-life equipment?

The equipment will be de-recorded from the asset ledger, fixed assets, and inventory.

After Sales Service

Through AMAX intelligent manufacturing ecological operation services, to help all partners from the development of on-line, to the implementation of delivery and after-sales support formed by the integrated professional business model. Through the integration of applications and in-depth integration to meet the integrated application needs of enterprises, driving the development of ecological partners; through the provision of public capabilities and domain services, so that the focus of partner capabilities, empowering partners enterprise service industry.

Consulting Services

-Quantify and analyze the value of industrial APP to enterprises

-Assist in pre-sales work

Business Training Services

-Industry Solutions Training

-Explanation of industry business knowledge

-Project Management Training

-Project Management Support Delivery Services

-Implementation delivery services for key projects

Service Support

Consulting Diagnosis:

Business Management Diagnosis and Analysis

Smart Factory Architecture Analysis

Assessment of informationization and automation status and application capability of enterprise smart factory

Optimization recommendations:

Suggest management optimization and objectives

Identify key system support points and requirements for smart factories

Enterprise smart factory business identification and demand analysis

Alignment with existing policies

Architecture Master Plan:

Define the strategic objectives of smart factory

Building a complete blueprint for smart factory planning

Information blueprint design

Automation blueprint design

Build the technical architecture and guarantee system of smart factory

Complete standardized docking

Plan implementation on the ground.

Determine the project schedule and timeline for each phase

Define detailed implementation plans for each project

Common problems and key technologies solved

Establishment of organizational structure and synchronization of projects